Another prestigious project with LTA to supply American Wise Power UPS for the $2 billion ECID project - world’s first four-in-one depot, integrating three train depots and one bus depot within a single site.
The train depot complex will house three MRT Lines – the Downtown Line Depot underground, the Thomson-East Coast Line Depot at-grade and the East-West Line Depot elevated on the level above. The three train depots have been designed to operate independently of one another, with a total stabling capacity of around 220 trains.
The bus depot will be an independent structure located next to the train depot complex. The ground level will house the maintenance depot while the upper levels will provide parking for about 760 buses.
Comentários